EVD-119
Rapid recycling of WTC steel before a full forensic metallurgical programme
government reportofficial governmentauthenticoriginal
Provenance
- Source
- FEMA 403 — World Trade Center Building Performance Study (2002)
- Date
- 2002-05-01
- Page
- —
- SHA-256
- 3d3b084b20450ab15fddc2488dcbf9324c9eb4620333f88e08cadc29be3dbca4
- Classification
- unclassified
- Copyright
- public domain
Quality 3.50 / 5components retained
Prov5
Auth5
Ind2
Contemp3
Corr3
Spec3
Comp3
Chain4
Observation
Most WTC structural steel was recycled before a full federal engineering investigation existed.
Interpretation
A documented evidence-preservation failure. Motive is not established by the fact of recycling.
Source text
OBSERVATION: Cleanup sent the large majority of WTC steel to recyclers in the weeks after 11 September, before NIST's statutory investigation (National Construction Safety Team Act, 2002). FEMA and later NIST worked from a remnant set. INTERPRETATION A: disaster-site necessity, not concealment. INTERPRETATION B: destruction of the primary physical evidence, incompatible with a serious forensic investigation of possible explosives. Both interpretations are stored. The fact of recycling is not disputed.
Hypothesis linkage
Steel recycling destroyed the best physical evidence either way.
People
Citations
- No citation edges.